Bringing a Steam Boiler On-Line from Cold

To help understand what needs to be done and why things need to be done in a certain way, the following procedure presumes that the boiler is completely cold and dry, such as after a prolonged shutdown or annual inspection.

Steps can be omitted for boilers with some residual heat still in them and a typical example of this could be the start up after a weekend shutdown where the boiler has dropped in pressure and cooled, yet still has heat in it.

Note: The need to heat the boiler slowly will be explained throughout this procedure and it can take many hours for a large cold boiler to be heated correctly to operating temperature and pressure. Timing will also depend on how much treated water is available to fill the boiler, so be prepared for a long day and you may have to include a shift handover procedure to safely complete the task.

Read full article here

Download

Further reading

BOAS Assessors – the key to our success
13th February, 2024
 Inadvertent steam release results in tragic outcome on cruise ship
15th February, 2024
CEA Members help out at Museum
15th February, 2024
Emission Limit Values for Hydrogen and Non-Conventional Fuels
15th February, 2024

How to get in touch

Please do not hesitate to contact our friendly office team.

Become a membercontact us