Aggregate Industries’ Colemans Quarry site has become the first asphalt plant in the UK to make the switch to LNG, curring both costs and carbon emissions with the help of Calor.

Based in north Somerset, the plant has been supplying the construction industry with building material for more than 60 years. It uses large quantities of gas to heat and dry the 250,000 tonnes of asphalt produced each year, and as the site is active 24/7, maintaining a constant, reliable supply of fuel plays a vital role in hitting production targets and meeting customer demand.

Read Case Study

[cea_button link=https://ceabackup.mlademos.co.uk/wp-content/uploads/2018/08/Calor_Aggregate_Industries_Case_Study_FV.pdf]

Similar Posts