Cochran

FORESTERHILL THE CENTRAL CAMPUS ENERGY SOLUTION

Having previously supplied Aberdeen Royal Infirmary with steam boilers back in the 1986, Cochran were contracted to provide the main steam generation equipment for the new Foresterhill Health Campus Energy Centre. Commissioned in June, the plant was operational by August 2012.
Download

BILLERUDKORNAS INCREASING EFFICIENCY AND REDUCING FUEL COSTS

BillerudKornas Beetham at Milnthorpe in Cumbria is a world leader in the manufacture of speciality papers for healthcare and food packaging markets. Recently BillerudKornas made the decision to replace their existing 40-year-old boilers in order to reduce the fuel and maintenance costs.
Download

EVOLVE POLYMERS RECYCLING WASTE HEAT INTO VALUABLE ENERGY

Cochran recently installed a Heat Recovery Boiler system for Evolve Polymers at Hemswell in Lincolnshire. The project which made use of exhaust heat from two gas engines was completed in association weith leading generator hire company, Aggreko.
Download